EV charger installation cost & savings

Installing an EV charger in Norfolk is a cost-effective way to enjoy convenient home charging while saving on energy costs. EV charger installation costs typically range from £500 to £1,500, depending on the charger type and installation complexity. For EV charger grants, businesses, charities, and public sector organizations can receive up to £350 (or 75% of the cost, whichever is lower) per socket, with a maximum of 40 sockets across all sites. Home charging is significantly cheaper than public charging, especially with off-peak electricity rates, leading to long-term savings of £800 – £1,200 per year compared to petrol or diesel. Investing in an EV charger offers financial benefits, convenience, and a greener way to drive. See below some more information about EV charger installation costs.

Understanding EV charger costs and savings in Norfolk Maximize your investment with efficient charging solutions

Financial Benefits of an EV Charger

Benefit
Details
Potential Savings
Lower Charging Costs
Home charging is cheaper than public stations, especially with off-peak rates.
Up to 70% savings on charging costs
Fuel Cost Savings
Switching from petrol/diesel to electric reduces fuel expenses.
£800 – £1,200 per year
Government Grants
The EV Chargepoint Grant offers up to £350 off installation costs.
£350 upfront savings
Increased Property Value
Homes with EV chargers are more attractive to buyers.
Potential home value increase
Smart Charging Savings
Scheduling charging during off-peak hours reduces electricity costs.
Extra 20-30% savings
Reduced Maintenance Costs
EVs have fewer moving parts than petrol/diesel cars, lowering servicing costs.
£300 – £500 per year

EV Charger Costs in the UK

Charger Type
Charger Cost
EV Charger Installation Cost
Total Estimated Cost
3.6kW EV Charger
£300 – £600
£200 – £500
£500 – £1,100
7kW EV Charger
£500 – £900
£300 – £800
£800 – £1,700
22kW EV Charger
£900 – £1,500
£500 – £1,500
£1,400 – £3,000

Additional Costs

Smart Features (WiFi/App Control): +£100 – £300
Tethered Cable (Built-in Cable Option): +£50 – £200
Longer Cable Runs (More Wiring Needed): +£100 – £500
Upgrading Fuse Board (if required): +£200 – £500